Honeycomb partition
Honeycomb partition, distribution partition of 50, 60 or 70 mm in prefabricated panels of storey height.
1: 50 or 70mm panel.
2: Tape and plaster joint treatment.
3: Cleat.
4: 35mm screw.
5: Guide key.
6: Sole.
Soul
Gray cardboard cut and assembled by the manufacturer in the form of a honeycomb network with orthogonal mesh
35mm screw
Quick to set up and at low cost. Mainly for HLM "Housing at Moderate Rent" Low-end villa "
Separations of rooms or research into sound quality and solidity is not a priority, 26 dB.
Against the simplest of partitions in placostil (72) 33 dB with glass wool 45mm 42 dB.
The aveolar partition of 50 is made of an assembly of prefabricated panels composed of two
plasterboards of two BA10 joined by a cardboard honeycomb network.
The aveolar partition of 72 consists of an assembly of prefabricated panels composed of two
plasterboards of two BA13 joined by a cardboard honeycomb network.
Standard
Accepted field of employment
Use :
• in a distribution partition or wall lining inside the same dwelling.
• for the realization of technical ducts.
Water repellent
Principle of installation.
The partitions are obtained by interlocking between a low rail fixed to the floor 28mm x 48mm and a high rail fixed to the ceiling
27mmx28mm in wood or chipboard. The two plates are connected to each other by two keys.
Trace on the ground the total thickness of the
partition. Identify the location of
doorframes. Secure the sole.
Transfer the line to the ceiling in
shifting it inwards, from
the thickness of the facing (1 cm for a
50mm partition). Fix the
rails (27x28mm) on the ceiling. Interrupted
to the right of passage of the partitions in return
(T or L) and electrical conduits. For the
departures from
partition, fix the vertical rails, they have
a length at least equal to a third
of the ceiling height. To stare
also a key on the sole.
Chipboard cleat
Chipboard sole
The bottom rails will be pegged to the slab, screwed to the floor, to the ceiling as well. (Maybe glued too)
Secure the timber to the 28x48 floor flat.
Put the plastic rail for wet parts on the floor. To take the height of the plate, take two 28x27 woods, place them on the sole on the ground up to the ceiling, take several points (the smallest measurement). Transfer it to the baking sheet and cut off the excess piece. Always cut the bottom of the plate, the baseboards will hide the misery.
Before positioning it, strip the top of the plate from its cardboard box by 5 cm. The keys must be positioned at approximately 1 m and 1.80 m.
For electric cables, strip the cardboard box with a piece of wooden sole.
12 screws of 35 mm per plate are sufficient. Always screw only on one side!
Hammer plug diameter 6
length 45 mm
Neoprene gel glue.
Double gluing.
Wood junction key
Substrate preparation work must be carried out before applying the finishing coatings.
Given the specific provisions relating to the feet of partitions and walls covered with tiling, the specific contract documents must specify who is responsible for carrying out this work (installation of the water protection system under the tiling, instead of bulkhead sheaths, elastomer seals).
Flexible plastic rail
Working heights:
50mm type: 2.60m
60mm type: 3.00m
72mm type: 3,60m
Pay attention to the weight, Weight per m²: A plate of 50 = 17kg 60 = 17.5kg
72 = 22kg knowing that a 1.20x2.50 plate = 3m².
Embed the panel in the cleat of the
ceiling and place two wedges at the foot.
T-junction It is treated like a start on a wall, with a vertical rail and a key at the foot.
Put the panel back on the sole
fixed to the ground.
Position two keys at a regular space, fix a batten for the foot of the partition.
Push everything in and then screw only on one side.
Push the panel against the starting wall.
35mm screw
Joinery panels.
A key arranged horizontally on each side of the transom ensures
its connection to the adjacent panel
please wait for a few moments
Angles
Three wedges (or a continuous cleat) are embedded in the panel fixed first. A rail is then nailed or screwed to the side of the panel. After cutting, the return panel is fitted. Each panel receives at the foot its connecting key fixed on the sole
Electrical sheath passage
Key
Hole saw hole
Hole saw hole
Batten
Hole saw
For the passage of the electrical sheaths to the hole made by the hole saw.
Go to the side before installing the wedges, or before installing the panel, strip the cardboard from the partition with a batten or sole of 2 m plus hammer,
batten
Cleat, smooth, sole
Installation of a wooden frame
batten
batten
Key
Sole
Installation of the last panel
Installation of the last panel.
Leave an opening corresponding to a panel, insert the keys entirely into panel A. Make a saw cut on one of the facings of partition A at the location of the keys. Degrease the location of the keys in panel B and C.
Embed the panel in the space reserved for this purpose. Drive the wedges towards panels B and C over half their length using a large point (70mm screw) sliding in the saw cuts. Screw the keys through one of the plates.
Slide key
To fit the last panel: fully insert the wedges on each side of the last panel to be fitted.
Make a saw cut on one of the sides of the panel (where the keys are placed).
Bay or partition stop
With metal profile.
With wooden profile.
With plate strip
With placotistel profile.